Maintenance At Every Start-Up; Entsorgung - Fronius TTG 1200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 103
5
Maintenance at
-
every start-up
-
In addition to the above list of steps to be carried out at every start-up, for wa-
ter-cooled welding torches:
-
-

Entsorgung

Die Entsorgung nur gemäß gleichnamigem Abschnitt in dem Kapitel „Sicher-
heitsvorschriften" durchführen
Check wearing parts, replace faulty wearing parts
Purge the gas nozzle of welding spatter
Ensure that all coolant connections are leak-tight
Ensure that there is a proper coolant return flow
6
43

Publicidad

Tabla de contenido
loading

Tabla de contenido