Preliminary Checks - tau TSKY-B Manual De Uso Y Mantenimiento

Ocultar thumbs Ver también para TSKY-B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
The structural features of TSKY-B products make them suitable for use on sectional or up-and-over doors, within the limits as specified in the
table.
Model
Guide
P-100BINBELT/CHAIN
P-100BINBELT3/CHAIN3
TSKY-B
P-100BINBELT350/CHAIN350
TSKY1-B
P-100BINBELT4/CHAIN4
Note: if art. P-100PROC (or P-100PROB) is used, the heights stated in the tables may be increased by 1m.
The measurements stated in the tables are guideline only and serve as a general estimate. The effective suitability of TSKY-B for the automation
of a specific door depends on the degree of leaf balance, friction on the guides and other factors, including occasional events, such as wind pres-
sure or the presence of ice, which may obstruct leaf movement.
2.2_ TYPE OF SYSTEM AND CABLE SECTIONS (FIGS. 3-4)
1_ Gearmotor with built-in
control
2_ Photocells
a_ 4x0,5 mm²
b_ 2x0,5 mm² + RG58
3_ INSTALLATION
TSKY-B must be installed by qualified personnel in compliance with current legislation, standards and regulations as well as the
specifications in these instructions.

3.1_ PRELIMINARY CHECKS

Before installing TSKY-B the following checks are required:
Ensure that all material used is in perfect condition, suitable for use and compliant with standards.
Ensure that the door structure is suitable for power-operation.
Ensure that the door has the force and dimensions within the application limits as specified in paragraph 2.1.
Ensure that the door complies with standards EN12604 and EN12605.
During movement, the door must never invade public areas allocated for the transit of pedestrians or vehicles.
During door travel, ensure that there are no points of marked friction, both during opening and closing.
Ensure sufficient strength of the mechanical stops and check that there is no risk of the door derailing.
Ensure that the door is adequately balanced, i.e. it should not move if left stationary in any position.
Ensure that the fixing points of the various devices (photocells, pushbuttons etc.) are located in areas protected against the risk of impact, and that the
fixing surfaces are sufficiently solid.
Ensure that the minimum and maximum clearances are as specified in figures 5 and 6.
Ensure that parts of the operator cannot come into contact with water or other liquids.
Do not keep TSKY-B components near sources of heat or expose to flames; these actions may damage or cause malfunctions, fire or hazardous situ-
ations.
If the door is equipped with a pedestrian pass door, ensure that this does not obstruct normal door travel; if necessary fit a suitable interlock system.
If the door to be automated is up-and-over, check value A of figure 7, i.e. the minimum distance between the upper edge of the guide and the maxi-
mum point reached by the upper edge of the door. Otherwise TSKY-B cannot be fitted.
Connect the TSKY-B power plug to an electrical socket equipped with safety earthing.
The electrical socket must be protected by an adequate thermal magnetic cut-out and residual current circuit breaker.
3.2_ SLIDING GUIDE ASSEMBLY
If supplied with the sliding guide in 3 sections, these must be assembled as described below:
1_ Straighten the three tracks after inserting the butterfly bracket on the section (for ceiling mounting), as shown in fig. 8
2_ Slide the joint to join the tracks (fig. 9) and secure using the screw (B fig. 9) suppied.
3_ Adjust the tension of the chain/belt by means of the chain tensioner nut (A fig. 9) until it is sufficiently taut.
Otherwise, if supplied with the pre-assembled guide, tension the chain/belt until it is sufficiently taut.
If the chain/belt is tensioned excessively, the motor will undergo excessive stress with a consequent increase in current absorption.
If the height of the door to be power-operated is greater than 2,5 m, the optional accessory 100PROC (for chain drive) or 100PROB (for belt drive)
is required to extend the sliding guide by 1 m. To assemble, proceed as follows:
• guide 100BINCHAIN3 – chain drive (100PROC)
1_
Insert the additional 1-metre section inside its joint of 700 mm (fig. 10).
2_
Keep the drive carriage locked in place (A fig. 11) and slide the chain until the joint protrudes (B fig. 11).
3_
Add the additional section on the chain (fig. 12).
4_
Slide the chain until it is locked on the drive carriage (fig. 13).
5_
Insert the additional section in the casing (with joint) and join the four tracks as described above (figs. 8-9).
6_
Tension the chain by means of the nut (A fig. 14) until it is sufficiently taut.
SECTIONAL
door
Height
2,3 m
2,8 m
3,3 m
3_ Photocells on post
4_ Sensitive edge
c_ 2x0,5 mm²
d_ 3x0,5 mm²
Model
Guide
P-100BINBELT/CHAIN
TSKY-B
P-100BINBELT3/CHAIN3
TSKY1-B
P-100BINBELT350/
CHAIN350
5_ Flashing light and aerial
6_ Key-operated selector switch
e_ 3x0,5 mm²
f_ 4x0,5 mm²
21
UP-AND-OVER
door projecting (with accessory
P-100BANT)
Height
2,7 m
3,2 m
7_ Pushbutton panel
8_ External release (optional)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tsky1-bK995ma-s

Tabla de contenido