Preliminary Checks - tau T-SKY K691M Manual De Uso Y Mantenimiento

Ocultar thumbs Ver también para T-SKY K691M:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 54
2.1_ Application limits and dimensions (fig. 2)
All performance data of the products in the T-SKY range are pro-
vided in the table "Technical Data" are the only values that enable
and ensure correct evaluation for use.
The structural features of T-SKY products make them suitable for
use on sectional or up-and-over doors, within the limits as speci-
fied in the table.
Model
T-SKY (guide P-100BINBELT/CHAIN)
T-SKY (guide P-100BINBELT3/CHAIN3)
T-SKY1 (guide P-100BINBELT/CHAIN)
T-SKY1 (guide P-100BINBELT3/CHAIN3)
Model
T-SKY (guide P-100BINBELT/CHAIN)
T-SKY (guide P-100BINBELT3/CHAIN3)
T-SKY1 (guide P-100BINBELT/CHAIN)
T-SKY1 (guide P-100BINBELT3/CHAIN3)
Model
T-SKY (guide P-100BINBELT/CHAIN)
T-SKY (guide P-100BINBELT3/CHAIN3)
T-SKY1 (guide P-100BINBELT/CHAIN)
T-SKY1 (guide P-100BINBELT3/CHAIN3)
Note: if art. P-100PROC (or P-100PROB) is used, the heights stat-
ed in the tables may be increased by 1m.
The measurements stated in the tables are guideline only and
serve as a general estimate. The effective suitability of T-SKY for
the automation of a specific door depends on the degree of leaf
balance, friction on the guides and other factors, including occa-
sional events, such as wind pressure or the presence of ice, which
may obstruct leaf movement.
2.2_ Type of system and cable sections (figs. 3-4-5)
1_
Gearmotor with built-in control
2_
Photocells
3_
Photocells on post
4_
Sensitive edge
5_
Flashing light and aerial
6_
Key-operated selector switch
7_
Pushbutton panel
8_
External release (optional)
a_
4x0,5 mm²
b_
2x0,5 mm² + RG58
c_
2x0,5 mm²
d_
3x0,5 mm²
e_
3x0,5 mm²
f_
4x0,5 mm²
3_
INSTALLATION
T-SKY must be installed by qualified personnel in com-
pliance with current legislation, standards and regu-
lations as well as the specifications in these instruc-
tions.

3.1_ Preliminary checks

Before installing T-SKY the following checks are required:
SECTIONAL door
Height
Width
2,5m
3,5m
2,5m
3,5m
2,5m
5m
2,5m
5m
UP-AND-OVER
door non projecting
(with accessory
P-100BANT)
Height
Width
2,2m
3m
2,2m
3m
2,2m
4m
2,2m
4m
UP-AND-OVER
door projecting
(with accessory
P-100BANT)
Height
Width
2,8m
3m
2,8m
3m
2,8m
4m
2,8m
4m
3.2_ Sliding guide assembly
If supplied with the sliding guide in 3 sections, these must be as-
sembled as described below:
1_ Straighten the three tracks after inserting the butterfly bracket
2_ Slide the joint to join the tracks (fig. 10) and secure using the
3_ Adjust the tension of the chain/belt by means of the chain ten-
Otherwise, if supplied with the pre-assembled guide, tension the
chain/belt until it is sufficiently taut.
If the height of the door to be power-operated is greater than 2,5
m, the optional accessory 100PROC (for chain drive) or 100PROB
(for belt drive) is required to extend the sliding guide by 1 m. To
assemble, proceed as follows:
• guide 100BINCHAIN3 – chain drive (100PROC)
1_
2_
3_
4_
5_
6_
T-SKY Series
Ensure that all material used is in perfect condition, suitable for
use and compliant with standards.
Ensure that the door structure is suitable for power-operation.
Ensure that the door has the force and dimensions within the
application limits as specified in paragraph 2.1.
Ensure that the door complies with standards EN12604 and
EN12605.
During movement, the door must never invade public areas
allocated for the transit of pedestrians or vehicles.
During door travel, ensure that there are no points of marked
friction, both during opening and closing.
Ensure sufficient strength of the mechanical stops and check
that there is no risk of the door derailing.
Ensure that the door is adequately balanced, i.e. it should not
move if left stationary in any position.
Ensure that the fixing points of the various devices (photocells,
pushbuttons etc.) are located in areas protected against the
risk of impact, and that the fixing surfaces are sufficiently solid.
Ensure that the minimum and maximum clearances are as
specified in figures 6 and 7.
Ensure that parts of the operator cannot come into contact with
water or other liquids.
Do not keep T-SKY components near sources of heat or ex-
pose to flames; these actions may damage or cause malfunc-
tions, fire or hazardous situations.
If the door is equipped with a pedestrian pass door, ensure that
this does not obstruct normal door travel; if necessary fit a suit-
able interlock system.
If the door to be automated is up-and-over, check value A of
figure 8, i.e. the minimum distance between the upper edge of
the guide and the maximum point reached by the upper edge
of the door. Otherwise T-SKY cannot be fitted.
Connect the T-SKY power plug to an electrical socket equipped
with safety earthing.
The electrical socket must be protected by an adequate ther-
mal magnetic cut-out and residual current circuit breaker.
on the section (for ceiling mounting), as shown in fig. 9.
screw (B fig. 10) suppied.
sioner nut (A fig. 10) until it is sufficiently taut.
If the chain/belt is tensioned excessively, the motor will
undergo excessive stress with a consequent increase
in current absorption.
Insert the additional 1-metre section inside its joint of 700 mm
(fig. 11).
Keep the drive carriage locked in place (A fig. 12) and slide
the chain until the joint protrudes (B fig. 12).
Add the additional section on the chain (fig. 13).
Slide the chain until it is locked on the drive carriage (fig. 14).
Insert the additional section in the casing (with joint) and join
the four tracks as described above (figs. 9-10).
Tension the chain by means of the nut (A fig. 15) until it is suf-
ficiently taut.
If the chain/belt is tensioned excessively, the motor will
undergo excessive stress with a consequent increase
in current absorption.
13

Publicidad

Tabla de contenido
loading

Tabla de contenido