Step-By-Step Installation Procedure - Manitowoc SM Serie Manual De Instalación, Operación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 2

Step-by-Step Installation Procedure

1. Prepare the site by following the instructions under
Electrical Service and Water Supply and Drain
Requirements.
2. Remove ice machine from carton.
3. Inspect for damage.
4. Remove literature/warranty packet and drain hose from
inside the ice machine.
5. Adjust leg levelers (or install optional legs). Refer to
"Leveling the Ice machine" on page 10
6. Reverse door if desired. See "Reversing Door Swing" on
page 15.
7. For a gravity drain, install drain hose to drain on back of
ice machine and route to open site drain. For optional
drain pump method, see "Drain Pump Option" on page
14.
Part Number 000001590 Rev05 07/22
8. Use compression fitting to connect the Water Inlet on
back of ice machine to the prepared 1/4" ID cold water
line. Refer to "Water Supply and Drain Requirements" on
page 12
9. Open the shut-off valve on the water line.
10. Connect electrical plug to grounded (three-prong),
polarized outlet. See "Electrical Service" on page 11
11. Place ice machine back in position and check leveling
again. Make any necessary adjustments.
12. Prepare descaler and sanitizer solution and descale and
sanitize the ice machine according to steps 1 through 7
"In Place Descaling/Sanitizing Procedure" on page 22.
13. Put one gallon of cold water into a container that will
easily pour under the lifted water shutters. Refer to
"Component Identification" on page 17 to identify
water shutters. Open shutters and add one gallon of cold
water.
14. Press Power button.
15. At initial start-up, ice machine will need approximately
30 minutes to freeze ice and up to 5 minutes to harvest
the ice.
Installation
13

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sms050a002

Tabla de contenido