Bosch GCM18V-10SD Instrucciones De Funcionamiento Y Seguridad página 13

Ocultar thumbs Ver también para GCM18V-10SD:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Fig. 3
39
40
41
38 Battery Pack Release Button releases the
battery pack so that it can be removed
from the battery bay.
39 Battery Bay is where a Bosch battery pack
(sold separately) is inserted.
40 Clamp Post Locations are two vertical
post holes in the base provided to support
the clamp.
16099221PJ GCM18V-10SD OSI 20220506.indd 13
Getting to Know Your Miter Saw
38
44
43
7
35
33
33
34
41 Torx wrench is used to change the blade
and to attach the base extensions.
42 Clamp is used to hold the workpiece to
the table and base. The clamp is inserted
into one of the clamp post locations.
43 Dust Port is the part that provides the
connection to the dust bag or vacuum
hose.
44 Battery Pack (sold separately)
-13-
42
40
5/6/22 11:42 AM

Publicidad

Tabla de contenido
loading

Tabla de contenido