6453505.book Seite 43 Donnerstag, 21. April 2016 4:59 16
Operating Instructions BA ULTIMATE Kit
64 53 505 D3551.201.04.02.02
7.2
Care of the push button chuck
To remove deposits and ensure proper functioning of the clamping
Care of the push button chuck
BA
system, the pushbutton chuck must be maintained with BA Ultimate
Spray.
Interval
Interval
Carry out maintenance work on the pushbutton chuck at least once a
week.
Required accessories
BA Ultimate Spray
Process _ contra-angle handpiece + turbine
BA Ultimate Spray
Process
1. Press the contra-angle handpiece head/turbine head with the chuck
firmly against the spray can nozzle.
2. Spray the chuck for 1 - 2 seconds.
IMPORTANT: Hold the spray can upright.
7 Care and maintenance
43