Testing The Fg Clamping System - B.A. International BA45 Instrucciones De Uso

Ocultar thumbs Ver también para BA45:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6453505.book Seite 50 Donnerstag, 21. April 2016 4:59 16
7 Care and maintenance
A
50
2. Let the turbine run briefly with cooling spray.
7.7

Testing the FG clamping system

Interval
Testing the FG clamping system
Test the FG clamping system at least once a month.
Required accessories
Chuck tester
Process
✔ The expiry date of the chuck tester (A) has not elapsed.
1. Insert the chuck tester into the FG clamping system [ → 29].
2. Tighten the chuck tester until the marking ring appears (withdrawal
force: 22 N)
Operating Instructions BA ULTIMATE Kit
64 53 505 D3551.201.04.02.02

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ba175Ba605Ba606Ba695fbBa695fm

Tabla de contenido