Descargar Imprimir esta página

GreenWorks ST60L414 Manual Del Operador página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
Turn the lower shaft until the button locks into the
positioning hole.
5.
Tighten the screw with the hex wrench (4).
1
2
11.4
ATTACH THE AUXILIARY HANDLE
1.
Remove the knob (1) from the handle.
2.
Attach the auxiliary handle and lower clamp (2)
on the shaft.
3.
Set the auxiliary handle in the comfortable
position.
4.
Put the bolt (3) through the holes.
5.
Tighten the auxiliary handle with the knob.
2
English
3
4
3
1
11.5
INSTALL THE BATTERY PACK
• If the battery pack or charger is damaged, replace
the battery pack or the charger.
• Stop the machine and wait until the motor stops
before you install or remove the battery pack.
• Read and understand the instructions in the
battery and charger manual.
1.
Align the ribs on the battery pack with the
grooves in the battery compartment.
2.
Push the battery pack into the battery
compartment until the battery pack locks into
place.
3.
When you hear a click, the battery pack is
installed.
11.6
REMOVE THE BATTERY PACK
1.
Push and hold the battery release button (1).
2.
Remove the battery pack from the machine.
1
12
OPERATION
Before you operate the machine, read and
understand the safety regulations and the operation
instructions.
Be careful when you operate the machine and
always observe your surroundings before operating
tool.
12.1
START THE MACHINE
1.
Push the lock-out lever (2) and pull the trigger (1).
11
WARNING
IMPORTANT
WARNING
EN

Publicidad

loading