8.4 Commissioning
i
Before commissioning, a single safety inspection must
be done (use the Single Safety Inspection form).
If the lift set up is done by a specialist (factory trained as-
sembler) then he can also do the safety inspection. If the
set up is done by the operating company then a specialist
must be tasked with the safety inspection.
The specialist confirms seamless operation of the lift on
the set up protocol for single safety inspection and releas-
es the lift for use.
i
After commissioning please complete the assembly pro-
tocol and send to the manufacturer immediately.
8.5 Changing the assembly location
To change the assembly location the pre-conditions must
be met according to the assembly guidelines. The loca-
tion change is to be done according to the following se-
quence:
• Move the lift rails to about half height.
• Remove the lifting arm (remove the safety ring of the
lifting arm pin, pull out the lifting arm pin and remove
the lifting arm).
• Disconnect electrical supply lines to the lift from mains
power.
• Remove hydraulic lines above on the opposite side and
seal them off with blind stoppers.
• Only loosen cross beams on one side and fold them
under along with the hydraulic lines.
• Securely fix the beam to the columns.
• Suction off hydraulic oil.
• Loosen the anchor fastenings.
• Carefully transport the lift column using appropriate
auxiliary means (e.g. crane, forklift, etc) to the new as-
sembly location.
• Assemble the lift according to the procedure during as-
sembly and anchoring before first commissioning.
Use new anchors. The old anchors are no
!
longer fit for purpose.
108