Made
in
Germany
2.2 Changes to the design / construction
Inspections by a technical expert are required before recommissioning (date, type of change, technical expert signa-
ture).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
2.3 Changing the assembly location
Inspections by a technical expert are required before recommissioning (date, type of change, specialist signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
76
_________________________________________________
Technical expert signature
_________________________________________________
Signature of Technical Expert of Safety inspections
OPI-POWER LIFT HF 3S 3000-4000-V4.0-DE-EN-FR-ES-IT