the Ssc short circuit power is
larger or equal to 2932.5 kW at
the interface point between the
operator's supply and the public
supply. It is the responsibility of
the installer or user of the device,
after consultation with the distribu-
tion system operator if necessary,
to make sure that the device is
only connected to a supply with
an Ssc short circuit power which
is larger or equal to 2932.5 W.
Note!
The device is only for use in
areas which are supplied with a
current load capacity of at least
100 A per phase.
z Before use
Take all parts from the packaging and
check whether the inverter flux cored
wire welder or parts show any damage.
If this is the case, do not use the inverter
flux cored wire welder. Contact the
manufacturer via the indicated service
address.
Remove all protective films and other
transport packaging.
Check that the delivery is complete.
z Assembly
z Assembling the welding
protection shield
Insert the dark welding lens
writing facing up into the shield body
z Inserting the flux cored wire
plug from the mains socket prior to each
maintenance task or preparatory work in
order to prevent the risk of an electric shock,
injury or damage.
Note: Different welding wires will be
needed depending on the application.
Welding wires with a diameter of
0.6–1.0 mm can be used with this device.
Feed roll, welding nozzle and wire cross-
section must be compatible with one another.
The device is suitable for wire reels weighing
up to maximum 1000 g.
Note: Make sure that the end of the wire
does not come loose and cause the roll to
roll out on its own. The end of the wire may
not be released until during assembly.
21
with the
20
(see Fig. C). The labelling on the dark
21
welding lens
must now be visible from
the front of the protective shield.
Push the handle
22
the corresponding notch of the mask,
until it snaps into place (see Fig. D).
Always unplug the mains
Unlock and open the cover of the wire
1
feed unit
by pushing the latch up.
Unlock the roller unit by turning the roller
mount
29
anti-clockwise (see Fig. F).
Pull the roller mount
(see Fig. F).
Completely unpack the flux cored wire
17
welding spool
, so that it can unrolled
without difficulty. Do not release the wire
end yet (see Fig. G).
Place the wire reel on the shaft. Make
sure that the roll unwinds on the side of
the
31
wire feed guide (see Fig. G).
Place the roll mount
it by pressing and turning it clockwise
(see Fig. G).
Undo the adjustment screw
it downwards (see Fig. H).
from the inside into
off the shaft
29
29
back on and lock
27
and swing
83
GB/MT