Descargar Imprimir esta página

Sime MURELLE EQUIPE 220 BOX ErP Instrucciones Originales página 37

Ocultar thumbs Ver también para MURELLE EQUIPE 220 BOX ErP:

Publicidad

Idiomas disponibles

Idiomas disponibles

FOR THE INSTALLATION TECHNICIAN
CONTENTS
1
DEVICE DESCRIPTION .......................................................................................................................page
2
INSTALLATION ....................................................................................................................................page
3
CHARACTERISTICS .............................................................................................................................page
4
USE AND MAINTENANCE ..................................................................................................................page
Our Company declares that MURELLE EQUIPE 220-330-440-550-660 BOX ErP boilers comply with the
essential requirements of the following directives:
- Boiler Efficiency Directive 92/42/EEC
- Gas Regulation 2016/426/EC
- Electromagnetic Compatibility Directive 2014/30/EU
- Low Voltage Directive 2014/35/EU
- Ecodesign Directive 2009/125/EC
- Regulation (EU) N. 813/2013 - 811/2013
When turning the boiler on for the first time it is best to run the following checks:
– Make sure there are no flammable liquids or materials in the boiler's near vicinity.
– Make sure that electrical connections are correct and that the grounding wire is connected to a
good grounding system.
– Open the gas tap and check the seal on the fixtures including the burner.
– Make sure that the boiler is set to operate with the type of gas supplied.
– Make sure that the exhaust flue is free and/or correctly assembled.
– Make sure that any shutters are open.
– Make sure that the system was filled with water and that all air was drained.
– Make sure the distributor is not obstructed.
– Discharge any air in the gas pipes by using the pressure escape on the gas valve.
CONFORMITY
IMPORTANT
38
44
55
62

Publicidad

loading