Descargar Imprimir esta página

B.A. International BACS125 Manual Del Operador página 20

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 142
4 Pre-reprocessing
18
4
Pre-reprocessing
4.1
Initial start-up and longer breaks in use
An adequate normalization phase must be maintained
following transport before initial operation.
Sterilize the ultrasonic handpiece and accessories prior to
startup  [→ 37].
Clean and maintain the ultrasonic handpiece after longer
breaks in use.
4.2
Prior to starting the work day
Flush the water paths for 2 minutes.
4.3
Before each patient
1.
Flush the water paths for 30 seconds.
2.
Attach the ultrasonic handpiece  [→ 21].
Operating Instructions BACS125 / BACS126
63 83 066  D3275.201.08.03.02

Publicidad

loading

Este manual también es adecuado para:

Bacs126