Descargar Imprimir esta página

Zodiac Nature2 Fusion soft Manual De Instalación Y Operación página 17

Ocultar thumbs Ver también para Nature2 Fusion soft:

Publicidad

Idiomas disponibles

Idiomas disponibles

Heat Sink
L-Bracket
Chlorine Generator
Power Interface Board
Figure 8.
Installation of the User Interface
3.10 Installation of the Chlorine Generator Device User Interface on an AquaLink® RS or
PDA Bezel
1.
On the chlorine generator user interface board, connect one end of the ribbon cable to the 16-pin J1 connector as
shown in Figure 9.
2.
Connect the other end of the ribbon cable to the power interface 16-pin J1 connector.
3.
Attach the chlorine generator user interface board to the bezel using the four (4) screws provided.
J1 Connector,
Power Interface
Board
Ribbon Cable
Figure 9.
Installation of the User Interface
|
Zodiac
Nature
2
Fusion soft
Installation and Operation Manual
®
®
J1 Connector,
User Interface
Page 17
ENGLISH
Cut JL1 Jumper to configure
board as a Nature
Fusion
2
Soft 700 Model
2 1
4 3
Screws (4)

Publicidad

loading