6.
Tighten strain relief fitting screws for the flow/temp/salinity sensor and the DC cord. Do not pull
flow/temp/salinity sensor cable or DC cord too tight. Allow some slack cable inside of power pack enclosure.
Do not over-tighten the strain relief fitting. Over-tightening can cause damage to the flow/temp/salinity sensor cable.
7.
Prior to reattaching the front cover, check the wiring. Be sure the flow/temp/salinity sensor is plugged in. The
DC cord should be plugged in. Also, check the AC wiring.
8.
If the ribbon cable connecting the user interface to the power interface board was disconnected during
installation then reconnect before reattaching cover (see Figure 11, Figure 12 and Figure 13).
Do not operate the electrolytic cell without water circulation. A buildup of flammable gases will result in FIRE or
EXPLOSION.
RIBBON CABLE TO
USER INTERFACE
CHLORINE GENERATOR
USER INTERFACE
Flow, Salinity, Temp Sensors
To Chlorine Generator Cell
Pool Pump Timer
Circuit Breaker
Panel
9
240 VAC
Line 1
Line 2
50/60 Hz
3 wire
Ground
Figure 11.
Wiring Diagram for the Power Pack
|
Zodiac
Nature
2
Fusion soft
®
®
Power Pack Wiring Diagram
PRIMARY
CHLORINE GENERATOR
TRANSFORMER
CHLORINE GENERATOR
SECONDARY
BLACK
Factory wired for 240 VAC service; Middle primary
BLK/RED
wires connected together. If electrical service is
BLK/WHT
120 VAC, the power supply must be modified.
BLK/YEL
12
3
6
Load 2
Load 1
Ground (Chassis)
Filter Pump
(240 VAC)
Installation and Operation Manual
CAUTION
WARNING
J12
J13
J11
POWER INTERFACE
Use Copper Conductors Only – Rated for 90°C Minimum
Re-wired for
120 VAC
ENGLISH
LOW VOLTAGE RACEWAY
View of chlorine generator PCB
shown with transformers and
components located behind front
face plate.
HEAT SINK
L - BRACKET
HIGH VOLTAGE
To Earth
Bonding Point
BLK/WHT
BLK/RED
BLK
BLK/YEL
Load 2 (Neutral)
Load 1 (Hot)
Ground (Chassis)
Page 19
To Earth
Bonding Point