RAIL INSTALLATION - NON-FOLDING RAIL (continued)
SRE-3000 INSTALLATION 02-08-2019
7. Insert charge strips into rail.
Locate two (2) charge strip coils. Hold
one coil firmly to prevent uncoiling, and
carefully undo tape securing coil.
8. Using tin snips, cut a 45° bevel on end of
charge contact strips (see images at left).
NOTE: This will make it MUCH easier
to insert strip into carrier .
9. Slide beveled end of charge contact strip
into charge contact strip carrier until it
sides under lower charge contact.
10. Cut off excess charge contact strip flush
with carrier.
11. Repeat Steps 7-10 for the second charge
contact strip coil.
s
c
kip to
arriage
18.
on page
15
©Bruno Independent Living Aids, Inc.
INSTALLATION
i
nstallation
®