6. Commissioning, operation

Connection diagram

Power supply AC 24 V
Output signal 0 ... 10 V
GB
If the voltages being switched via the relays
are not in accordance with SELV, then the
power supply and signal/control cables of
the relays should be installed so that they
are separated. A separate cable entry is
available for both.
Commissioning
A prerequisite for the commissioning is a proper installation of all
electrical supply, control and measuring lines and of the pressure
connection lines.
Buttons for setting the individual functions
Key
MENU
BACK
OK
10
Before commissioning, the leak tightness of the pressure
connection lines must be checked.
Function
To access the menu, press the "MENU" button for approx. 3
seconds.
To exit the menu, press the "BACK" button.
To open an individual menu point, and to accept the changes,
press the "OK" button.
These buttons enable you to scroll within the menu.
WIKA operating instructions air2guide model A2G-45
Relay 1 (standard)
Relay 2 (option)