Connecting The Supply Voltage And Set Point - Aventics ED05 Instrucciones De Servicio

Válvula reguladora de presión
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 179
1. Insert the three base plate seals (15) in the thread
3
4
5
2. Place the ED05 pressure regulator on the base plate.
3. Insert both of the M6 x 75 screws (16) in the two through
15
6.4
00122946
To operate the ED05 pressure regulator, you must supply the
device with compressed air, connect the 24 V DC supply voltage,
and control the device with a set point.
Tabelle 6:
4
3
5
2
1
00125293
AVENTICS | ED05 | R414002533–BAL–001–AG
connections (3, 4, 5) and press in.
The seals are formed so they engage in the thread
connections and cannot fall out during assembly.
holes (see Fig. 5 on page 64) and tighten.
Tightening torque: 6 Nm

Connecting the supply voltage and set point

The actual value (–) and set point (–) are always connected
with 0 V in all devices.
Observe the following tables that list the plug assignments
for the two different series with integrated XPC plug, M12, as
well as the rectangular plug in accordance with
EN 175301-803.
ED05 pressure regulator with integrated XPC plug, M12
Integrated XPC plug, M12, male, 5-pin
Pin 1
24 V DC
Pin 2
Set point (+): current 0/4 to 20 mA or
voltage 0 to 10 V DC
Pin 3
0 V
Pin 4
Actual value (+): current 0/4 to 20 mA or
voltage 0 to 10 V DC or
24 V switch output
Pin 5
Functional grounding (FE)
Assembling the ED05 pressure regulator
65

Publicidad

Tabla de contenido
loading

Tabla de contenido