Screwing The Ed12 Onto The Base Plate; Connecting The Supply Voltage And Set Point - Aventics ED12 Instrucciones De Servicio

Ocultar thumbs Ver también para ED12:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.4
6.5
To operate the ED12, you must supply the device with compressed
air, connect the 24 V DC supply voltage, and control the device with
a set point.
Table 7:
4
3
Integrated XPC plug, M12, male, 5-pin
Pin 1
5
Pin 2
Pin 3
2
1
Pin 4
00125293
Pin 5
Table 8:
4
3
Integrated X1S plug, M12, male, 5-pin
5
Pin 1
Pin 2
Pin 3
2
1
Pin 4
00125293
Pin 5
AVENTICS | ED12 | R414002587–BDL–001–AB

Screwing the ED12 onto the base plate

Insert both of the M6 x 70 screws as shown in Fig. 4 on page 46
in the four holes and tighten.
Tightening torque: 6 Nm

Connecting the supply voltage and set point

The actual value (–) and set point (–) are always connected
with 0 V in all devices.
Observe the following tables that list the plug assignments for
the three different series with integrated XPC plug, M12;
integrated X1S plug, M12; and integrated X2M socket, M12, as
well as the rectangular plug, form A in accordance with DIN EN
175301-803.
ED12 with integrated XPC plug, M12
24 V DC
Set point (+): current 0/4 to 20 mA
0 V
Actual value (+): current 0/4 to 20 mA
Functional grounding (FE)
ED12 with integrated X1S plug, M12,
24 V DC
Not assigned
0 V
Not assigned
Functional grounding (FE)
49
Assembling the ED12

Publicidad

Tabla de contenido
loading

Tabla de contenido