Descargar Imprimir esta página

Progress PHN 1220 Manual De Usuario página 25

Publicidad

Idiomas disponibles

Idiomas disponibles

Instructions for building in
To ensure trouble-free operation of the
built-in appliance, the kitchen units or re-
cess that the appliance is built into must
have suitable dimensions.
In accordance with the regulations in
force, all parts which ensure protection
against accidental contact with live parts
and parts with basic insulation must be
secured in such a way that they cannot be
removed without tools.
These also include the fixing of any end
panels at the beginning or end of a line of
built-in units.
In any case, the accidental contact
protection must be ensured by the building
in of the appliance.
The appliance can be positioned with
its back or side wall against higher
kitchen
units,
appliances
However, only other appliances or units of
the same height as the appliance can be
placed against the other side wall.
Oven dimensions (see illustration)
Instructions for building in
To ensure trouble-free operation of the
built-in appliance, the kitchen units or re-
cess that the appliance is built into must
have suitable dimensions.
Securing in the unit
1. Open the oven door.
2. Secure the oven in the unit using the
four spacers (see illustration - A).
These fit exactly in the holes in the
frame. Then screw in the four
woodscrews (supplied) tightly (see
illustration - B).
All manuals and user guides at all-guides.com
or
walls.
progress 25

Publicidad

loading