Descargar Imprimir esta página

Toshiba RAV-SM564UT-E Manual De Instalación página 11

Ocultar thumbs Ver también para RAV-SM564UT-E:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

+00EH99858901_01EN_4-way_IM_printOnly.book Page 10 Tuesday, December 4, 2007 2:31 PM
4-way Air Discharge Cassette Type
Installation of ceiling opening and
hanging bolt
• Attach a nut (M10 or W3/8: not supplied) and
the Ø34 washer (supplied) to each hanging bolt.
• Insert a washer on both sides of the T groove of
the hanging bracket of the indoor unit, and hang
the indoor unit.
• Check that the four sides of the indoor unit are
level using a level vial (levelness: 5mm or less).
• Detach the installation gauge (accessory) from
the installation pattern.
• Using the installation gauge, check and adjust
the positional relation between the indoor unit
and the ceiling opening (1) (10 to 35mm:
4 sides) and the hanging-up height (2) (12 mm
to 17 mm: 4 corners).
(How to use the installation gauge is printed on
the gauge.)
Hanging bolt
(M10 or W3/8)
Nut (M10 or W3/8)
Eccentric washer
(Accessory)
* Install with the marking
"UP" facing up.
Hanging bolt
Level
Hanging bracket
* Procure hanging bolts
and nuts locally.
Washer (Accessory)
To prevent the bolt
from falling off (for
safety), be sure to set
it just under the
hanging bracket as
shown in the figure.
Nut (M10 or W3/8)
– 10 –
Level vial (levelness: 5mm or less)
Hanging bolt
Indoor unit
Hanging
bracket
(1) 10 to 35mm
Installation gauge
Indoor unit
Ceiling board
Installation
gauge
REQUIREMENT
Before installation of the indoor unit, be sure to
remove the cushion for transportation between
the fan and the bell mouth. Running the unit
without removing the cushion may damage the
fan motor.
Be sure to remove the cushion for
transportation between the fan and the
bell mouth.
Installation Manual
Ceiling
board
(2) 12 to
17mm
(1) 10 to
35mm
EN
10-EN
Toshiba XXXXXXX(X/X)

Publicidad

loading

Este manual también es adecuado para:

Rav-sm804ut-eRav-sm1104ut-eRav-sm1404ut-e