Descargar Imprimir esta página

golmar Stadio Plus Manual De Instalación página 52

Portero electrónico y videoportero instalación digital con placa codificada
Ocultar thumbs Ver también para Stadio Plus:

Publicidad

Idiomas disponibles

Idiomas disponibles

DOOR PANEL INSTALLATION
E
mbedding box positioning.
1650
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
will depend on the number of door panel modules.
Modules
1
Model
CE610
W
125
H
140
D
56
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain
a good quality picture on video door entry systems, avoid direct incidence from light sources.
Break the bottom flange to pass the cables through. In case of door panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions.
100
1850
1450
2
3
CE620
CE630
125
125 mm.
257
374 mm.
56 mm.
56
P
reparing the cables entry.
101
DOOR PANEL INSTALLATION
Pass the wiring through the hole made in the bottom part
of the embedding box. Level and flush the embedding
box. Once the embedding box is placed, remove the
protective labels from the attaching door panel holes.
A
ssembly the door panel modules.
Insert the header DOWN marked in the lower module and fix it by screwing the module
shafts.
Place the module spacer between lower and next modules, assuring that the spacer
adjustment notches are inside the panel. Fix the module by screwing the shafts.
Repeat this procedure in case of door panels with one more module (the maximum
number of modules placed vertically is three).
Insert the header UP marked in the last module and fix it by screwing the supplied screws.
P
lace the embedding box.

Publicidad

loading

Este manual también es adecuado para:

T3403ml