Descargar Imprimir esta página

Sungrow SG3.0RT Guía De Instalación Rápida página 38

Ocultar thumbs Ver también para SG3.0RT:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
4
Use appropriate mounting hardware for wall type.
The image shown here is for reference only. The actual product received may differ.
Optimizer:
1
Please ensure that the optimizer is installed facing the back of the module. Otherwise, the clip may be damaged.
Do not forcibly bend the clips when installing the optimizer by clips. Otherwise, the clip may be damaged.
Do not clamp the optimizer into holes in the module frame during installation. Otherwise, the optimizer
cannot be removed or the clips may be damaged.
It is recommended to install optimizers on the same side of modules.
Do not clamp and remove the optimizer multiple times. Otherwise, the clip may become loose, affecting
normal use.
PE / Erdung / messa a terra / Mise à la terre / Aarding / PE / Skyddsjord / PE / EP / PE / PE /
Energía potencial
1
L = E + (2~3) mm
5
M6
9.0 N m .
2
2
E
Heat shrink tubing
37
1.5 N m
3
M4
.

Publicidad

loading