Descargar Imprimir esta página

Gree Free Match Serie Manual De Usuario página 9

Acondicionadores de tipo cassette con panel compacto

Publicidad

2.5 Main body of hoisting air conditioner
(1) The primary step for install the indoor unit.
When attach the hoisting stand on hoisting screw, d o use nut and gasket
individually at the upper and lower of the hoisting stand to fix it. The use of gasket
anchor board can prevent gasket break off.
(2) Use install cardboard
Please refer to the install cardboard about the dimension of ceiling opening.
The central mark of the ceiling opening is marked on the install cardboard.
Install the install cardboard on the unit by bolt (3 piece), and fix the angle of the
drainage pipe at the outlet vent by bolt.
(3) Adjust the unit to the suitable install place. (Refer to the Fig. 2.3)
(4) Check if the unit is horizontal.
Inner drainage pump and bobber switch are included in the indoor unit, check if
4 angle of every unit are horizontal by water le ver. (If the unit is slant toward the
opposite of the coagulate water flow, there may be malfunction of the bobber switch
and lead water drop.)
(5) Backout the gasket anchor board used to prevent gasket break off and tighten
the nut on it.
(6) Backout the install cardboard.
Free Match For European Union
Fig. 2.4
5

Publicidad

loading

Este manual también es adecuado para:

Free match gkh(12)ba-k3dna2a/iFree match gkh(18)ba-k3dna2a/i