Filling The System; Routine Maintenance Instructions; Switching Off The Boiler - Baxi LUNA DUO-TEC MP 1.90 Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. FILLING THE SYSTEM

Periodically check that the pressure displayed on the pressure gauge is 1 - 1.5 bar, with the system cold. If it is lower, turn the
system filling tap installed by the fitter. Open the tap very slowly in order to vent the air.
The boiler is fitted with a hydraulic pressure gauge which prevents the boiler from working if there is no water.
If pressure drops occur frequently, have the boiler checked by the AUTHORISED TECHNICAL SERVICE CENTRE.

7. ROUTINE MAINTENANCE INSTRUCTIONS

To keep the boiler efficient and safe, have it checked by the Authorised Service Centre at the end of every operating period.
Careful servicing ensures economical operation of the system.

8. SWITCHING OFF THE BOILER

To turn off the boiler, disconnect the electric power supply using the two-pole switch. In the "Off" operating mode
the boiler stays
off but the electrical circuits remain powered and the anti-freeze function remains active.
25
7104645.02 (1-01/12)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Luna duo-tec mp 1.110

Tabla de contenido