EdilKamin Simpaty CHERIE Instalación Uso Y Mantenimiento página 40

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
COVERING INSTALLATION CHERIE
Phase C
Fig. 6
Phase D
47
Fase 1
Phase E
74
74
78
Fig. 5
44
47
Fig. 7
69
D
53
E
53
G
52
58
F
I
58
F
H
71
I
Phase F
Phase C
left side ceramic panel assembly:
13) Keep the hearth door closed
14) Align the apertures present on the front part of the
ceramic panel (47) to the fastening brackets (44) located
on the structure (fig. 5)
15) Insert the ceramic panel in the brackets
16) Rest the rear part of the ceramic panel on the galva-
nised side of the stove and back on the rear ceramic
fastening profile (fig. 6)
17) If necessary, adjust the fastening brackets as per
point 9 (fig. 7)
18) Reposition the upper side cast iron front panel (49)
19) Reposition the rear fastening ceramic right profile
(82)
Note: silicone pads have been supplied to be used for
any alignments between the ceramic panel and cast iron
parts, where 3 pads are to be placed at an equal distance
on the base of the lower cast iron front panel
Phase D
ceramic front panel assembly:
20) Line up the holes in the upper ceramic front panel
(53) with the corresponding holes in the front grille (69).
21) In order to fasten the upper ceramic front panel (53)
to the upper front grille (69), insert the knurled washer
onto the thread of the pin and tighten it manually
(without the use of any tools).
22) Assemble the grille including the ceramic panel to
the stove, putting suitable pressure to hook it on to the
stop springs
23) Unscrew the lower front cast iron grille (52) stop
screws with the supplied Allen wrench and remove it
from the stove
24) Line up the holes in the lower ceramic front panel
(53) with the corresponding holes in the front grille (69).
25) In order to fasten the lower ceramic front panel (53)
to the lower front grille (69), insert the knurled washer
onto the thread of the pin and tighten it manually
(without the use of any tools).
26) Assemble the grille including the ceramic panel to
the stove and screw in the previously removed grille stop
screws.
Phase E
ceramic top assembly:
27) Place the ceramic top (79) over the cast iron stove
top
28) If the ceramic top proves unstable, remove it
29) Stability of the ceramic top is to be carried out,
where necessary, using the provided washer between the
pad and the cast iron top
30) Reposition the ceramic top
Phase F
The stove is now ready to be positioned.
40

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Simpaty funnySimpaty moonSimpaty spaceSimpaty vintage

Tabla de contenido