Descargar Imprimir esta página

RIB KIT PREMIER 24V Manual Del Usuario página 28

Ocultar thumbs Ver también para KIT PREMIER 24V:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

G
INSTALLATION PREMIER
B
PRE-INSTALLATION CHECK LIST
The gate leaves must be firmly fixed to the hinges on the gate pillars, they must not flex
during the movement and they must swing without any friction.
Before installing the operator, make sure you have enough room to fix the operator on the
pillar.
In case the gate is like the one depicted in Pic. 1, there is no need for any modification.
Gate features and installation must comply with local regulations and standards.
The gate can be automated only if it is in good conditions and complies with EN12604
norms.
- The gate leaf does not have to have a pedestrian opening. In the opposite case it is
necessary to take the appropriate steps, in accordance with EN 12453 norm point 6.5.1
(for instance; by preventing the operation of the motor when the pedestrian opening is
opened, by installing a safety microswitch connected with the control panel).
- Make sure not to create any trapping points or areas (e.g. when the gate completely opened,
between any opening in the gate frame and the side wall).
EMERGENCY MANUAL RELEASE
This applies only if the unit is not equipped with back-up batteries. In case of a black-out,
the gate can be pulled open after the operator has been unlocked with the emergency key
provided (rotate the key clockwise by 180°, Pic. 2).
EMERGENCY MANUAL RELEASE THROUGH AN EXTERNAL STRONG
BOX
In case of a black-out, should you need to unlock the gate from outside through an external
Strong Box, secure one end of the steel cord with sheath (A) (code ACG8022) to the
unlocking lever (B) on the operator, and the other end to the unlocking device (C) inside the
strong box, as in Pic. 3 (code ACJ9071 or ACJ9078).
CAUTION
In order to manually open the gate leaf make sure of the following:
- The gate leaves must be endowed with appropriate handles;
- Position of the handles onto the gate leaves must be in risk free area;
- The manual force necessary to move the gate leaves should not be higher than 225 N, in
case of installations at domestic/private dwellings, and 390 N in case of installations in
business premises (according to points 5.4.5 of the EN12453 norm).
Note: in case of an installation with an overlapping two leave swing gate, to ensure a
safe/proper locking, a mechanical bolt must be installed along with an electric lock. The
mechanical bolt (ACG5000) must be installed at the bottom of the first gate leaf to close
so that it will be triggert by the pressure of the second gate leaf. The electric lock will latch
one gate leaf to the other.
B
All manuals and user guides at all-guides.com
Hold-to-run operation
Impulsive - in sight
(e.g. push-button)
impulsive - out of sight
(e.g. remote)
automatic
* a typical example are those doors which do not have access to any public way
A: Hold-to-run operation made by push-button ex: code ACG2013
B: Hold-to-run operation made by key selector ex: code ACG1010
C: Adjustable power of the motor or photocells to respect impact forces as indicated in
Annex A
D: Safety strips and/or other additional devices to reduce the probability of contact with
the door.
E: Devices installed in such a way that a person can not be touched by the door.
B
28
Parts to install according to EN 12453 standard
COMMAND TYPE
Skilled persons
(out of public area*)
A
C or E
C or E
C and D, or E
A
USE OF THE SHUTTER
Skilled persons
Not skilled
(public area)
persons
B
Not possible
C or E
C and D, or E
C and D, or E
C and D, or E
C and D, or E
C and D, or E
C
2
3

Publicidad

loading

Este manual también es adecuado para:

Ad18010b