Descargar Imprimir esta página

SPALDING U-Turn SPA0368 Instrucciones De Montaje página 14

Sistema de baloncesto

Publicidad

Idiomas disponibles

Idiomas disponibles

Completely seal hole at the bottom of the bottom pole with heavy-duty tape (not included) to retain rebar (10) and
11.
concrete inside. Mix concrete (approximately 100 lbs. (45.4 kg)) and fill pole 1" - 2" (2.54 - 5.0 cm) below bottom
elevator hole on top pole section (1) as shown.
Do not proceed to the next step until concrete is fully cured. Follow directions on pre-mix or concrete packaging
regarding the necessary time required to allow the concrete to fully cure. If using concrete delivered on site
professionally, consult your provider for this necessary information.
1
Fill Line
11
3
STOP!
Pole must be completely filled with concrete
to the fill line as described in the instructions.
Failure to fill the pole with concrete could
cause the pole to weaken, bend and/or break
and pose a risk of injury.
10
NOTE
14
WARNING
Heavy-Duty Tape (Not Included)

Publicidad

loading