Descargar Imprimir esta página

SPALDING U-Turn SPA0368 Instrucciones De Montaje página 7

Sistema de baloncesto

Publicidad

Idiomas disponibles

Idiomas disponibles

WRITE MODEL NUMBER FROM BOX ONTO PAGE 1 OF THIS OWNERS MANUAL
1.
Correctly identify each pole section. Measure and mark
5-1/2" (13.9 cm) from top of bottom pole (3).
WARNING
Contact utilities before digging.
Underground wires pose an
electrocution hazard.
XG02.EPS
2.
Make sure ground is level with playing surface, then dig pole hole. (SEE FIGURES A & B) on page 9.
Note: Maximum distance from edge of hole to edge of playing surface should be 6" (15.2 cm).
Hole depth shown is the minimum allowed. Depending
on location, a deeper hole may be required. Consult
local building inspector and/or building codes for
depth of frost line. Please note a deeper hole requires
additional concrete.
NOTE
5 1/2" (13.9 CM)
6" (15.2 cm)
24" (61 cm)
24" (61cm)
7
TOP
BOTTOM
SEE NOTE:
1
3

Publicidad

loading