Descargar Imprimir esta página

Klarstein BALI BREEZE SMART Manual Del Usuario página 70

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
68
Requirements for operations at raised height
When carrying out installation at 2 m or higher above the base level, safety
belts must be worn and ropes of sufficient strength be securely fasten to the
outdoor unit, to prevent falling that could cause personal injury or death as
well as property loss.
Grounding requirements
The air conditioner is the class I electrical appliance and must ensure a reliable
grounding.
Do not connect the grounding wire to a gas pipe, water pipe, lightning rod,
telephone line, or a circuit poorly grounded to the earth.
The grounding wire is specially designed and shall not be used for other
purpose, nor shall it be fastened with a common tapping screw.
Interconnection cord diameter should be recommended as per instruction
manual, and with type O terminal that meet local standards (internal diameter
of type O terminal needs to match the screw size of the unit, no more than
4.2 mm).
After installation, check the screws whether have been fixed effectively, and
there is no risk of loosening.
Other requirements
The connection method of the air conditioner and the power cord and the
interconnection method of each independent element shall be subject to the
wiring diagram affixed to the machine.
The model and rating value of the fuse shall be subject to the silkscreen on
corresponding controller or fuse sleeve.
Packing list indoor unit
Indoor Unit
Remote control
Instructions
Drain pipe
Packing list outdoor unit
Outdoor Unit
Connecting pipe (2 pcs)
Plastic Strap
Pipe Protection Ring
Luting (putty)

Publicidad

loading

Este manual también es adecuado para:

100461001004691011004610210046103