Descargar Imprimir esta página

Klarstein BALI BREEZE SMART Manual Del Usuario página 78

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
76
Notes:
1.
This table is for reference only.
2.
The joints shall not be reused, unless after re-flaring the pipe.
3.
After installation, check the stop valve cover whether be fixed effectively.
Wiring connection
4.
Loosen the screws and remove
E-parts cover from the unit.
5.
Connect the cables respectively to
the corresponding terminals of the
terminal board of the outdoor unit
(see the wiring diagram), and if
there are signals connected to the
plug, just conduct butt joint.
6.
Ground wire: Remove the
grounding screw out of the electric
bracket, cover the grounding wire
end onto the grounding screw and
screw it into the grounding hole.
7.
Fix the cable reliably with fasteners (Pressing board).
8.
Put the E-parts cover back in its original place and fasten it with screws.
Wiring diagram
If your air conditioner is provided with interconnection cord, the wiring of the
indoor unit is connected in the factory, there is no need of connection.
If the interconnection cord is not provided, connection is needed in
accordance with the national wiring regulations.
L
to power
L
N
to power
Constant speed
1
N
to indoor unit
1
N(2)
to indoor unit
E-parts cover
1
2
N
L
N(2)
3
3
4
5
L
N
S
N
Lo

Publicidad

loading

Este manual también es adecuado para:

100461001004691011004610210046103