Descargar Imprimir esta página

SMA Sunny Boy Storage 3.8-US Instrucciones De Instalación página 66

Ocultar thumbs Ver también para Sunny Boy Storage 3.8-US:

Publicidad

Idiomas disponibles

Idiomas disponibles

9 Decommissioning the Inverter
9
Decommissioning the Inverter
To decommission the inverter completely upon completion of its service life, proceed as described
in this Section.
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 8, page 65).
2. Remove the DC conductor from the fuses for the DC connection.
3. Remove the AC conductors from the AC-out terminal block. To release the conductors from the
terminals, open the terminals with a flat-blade screwdriver (blade width: 4 mm (
4. Screw out the screws from the AC-out terminal block using a flat-blade screwdriver (blade
5
width: 4 mm (
/
 in)) and pull the terminal block out of the slot.
32
5. Remove all connection cables from the jacks located
on the battery interface module.
6. Remove all equipment grounding conductors from the equipment grounding terminals. To do
this, loosen each screw (TX 25), remove the equipment grounding conductor from the inverter
and retighten each screw (TX 25).
7. Remove the network cables from the jacks of the
communication assembly.
8. Remove all conduits with conductors from the inverter. To do this, screw the conduit fittings out
of the enclosure openings from the inside.
66
SBSxx-US-10-IA-xx-14
CAUTION
DANGER
FCC ID: SVF-KP20
IC: 9440A-KP20
A
B
Max. 30V DC
USB
SMA Solar Technology AG
5
/
 in)).
32
ANT.
B
D - I N
D-IN
SPS
Installation Manual
S P S

Publicidad

loading