Operating Instructions - Stihl SP 200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English / USA
1
2
3
4
:
Hold the hook steady with the
36 mm open-end wrench (1) and, at
the same time, use the 47 mm
wrench (2) to loosen the nut (3) at
the engine end of the drive tube.
Unscrew the nut from the thread.
:
Separate the drive tubes.
Push the cap (4) onto the front end
of the drive tube.
It is important to keep the ends of
the drive tube clean.
24
Connecting the Drive Tubes
:
Remove the cap from the front end
of the drive shaft and keep it in a
safe place.
:
Place the machine on the ground so
that it rests in the engine support.
:
Inspect the ends of drive tubes for
dirt and clean if necessary.
:
Push the front end of the drive tube
as far as stop onto the drive tube at
the engine end.
:
Rotate the front of the drive tube
until until the open side of the hook
points vertically downward – use
the 36 mm open-end wrench to hold
the hook steady for the following
operations.
:
Screw the nut onto the thread and
tighten it down firmly with the 47 mm
open-end wrench.
The open side of the hook must now
point vertically downward. If not,
repeat the steps described above.
:
Check swivel range of hook – see
"User Checks and Maintenance".
:
Attach the harness to the carrying
rings.

Operating Instructions

During break-in period
A factory new machine should not be run
at high revs (full throttle off load) for the
first three tank fillings. This avoids
unnecessary high loads during the
break-in period. As all moving parts
have to bed in during the break-in
period, the frictional resistances in the
engine are greater during this period.
The engine develops its maximum
power after about 5 to 15 tank fillings.
During operation
After a long period of full-throttle
operation, allow engine to run for a while
at idle speed so that the heat in the
engine can be dissipated by flow of
cooling air. This protects engine-
mounted components (ignition,
carburetor) from thermal overload.
After finishing work
Wait for engine to cool down. Drain the
fuel tank. Store the machine in a dry
place. Check tightness of nuts and
screws (not adjusting screws) at regular
intervals and retighten as necessary.
SP 200

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido