Maintenance At Every Start-Up; Disposal - Fronius TTG 1200A Manual De Instrucciones

Antorche manual tig
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 115
5
5
Maintenance at
-
every start-up
-
In addition to the above list of steps to be carried out at every start-up, for water-cooled
welding torches:
-
-

Disposal

Dispose of in accordance with the applicable national and local regulations.
Check wearing parts, replace faulty wearing parts
Purge the gas nozzle of welding spatter
Ensure that all coolant connections are leak-tight
Ensure that there is a proper coolant return flow
6
6
49

Publicidad

Tabla de contenido
loading

Tabla de contenido