Fig. 8 B
D
1.
Assemble the stand. The stand consist of bottom plate
(Fig. 8 B-A), 4 legs (Fig. 8 B-B) and top plate (Fig. 8 B-C).
2.
It is very important that the legs are mounted as shown in
fi gure 8 B-D.
3.
Place the stand at its fi nal position and make sure a gap
of min. 50 mm to the wall.
4.
The fl oor and stand has to be completely level (Fig. 8 B-E).
This is extremely important to ensure that the rest of
the installation is correct.
Fig. 9
Bracket 1
Bracket 4
Bracket 5
C
B
50 mm
A
E
Bracket 2
Bracket 2
Bracket 3
Bracket 6
Fig. 10
NB!: Do not use corner stones marked «223628» before
the fourth layer.
1.
Fit the fi rst layer of soap stone on the bottom plate. Use
bracket 4 and bracket 6 under to hold them in place.
2.
Make sure the layer is level and placed correct on the
bottom plate (Fig. 10 A). Use a rubber mallet to adjust
the stones.
3.
Place the front stone and corner stones of the second layer
using bracket 1 (Fig. 10 B).
Fig. 11
1.
Position the burn chamber on the stand. Make sure that
the burn chamber is positioned stably.
2.
Refi t all the parts that were removed for easier handling
of the insert.
3.
Mount the fi rst rear plate to bracket 6 that is placed under
the fi rst layer of soap stone.
4.
Mount bracket 3 from the inside through the back plate
(Fig. 11 A). Use a hammer and knock it gently into the
soap stone.
5.
Place the side stones of the second layer between the
corner stones and the rear plate. Use bracket 3 to hold it
in place (Fig. 11 B).
6.
Make sure everything is level.
ENGLISH
B
A
3mm
B
A
17