Installation; Unpacking And Contents Check; Internal Batteries Connection (Battery Start-Up) - Eaton Pulsar Serie Manual De Instalación, Usuario

Ocultar thumbs Ver también para Pulsar Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 149

2. Installation

2.1 Unpacking and contents check

(40) MX 4000 or 5000 UPS.
(41) Two sets of tower stands.
(42) RS232 communications cable
(43) Product documentation.
(44) 4 cable lockers.
(45) Telescopic rails for rack enclosure with mounting
hardware (optional, or standard with NetPack
version).
Packaging must be destroyed according to waste management standards. Recycling icons are displayed for easy
selection.
A dangerous voltage is present inside the power module and the battery module. Any operations to be carried out
on these modules must be done so by qualified staff.
2.2 Internal battery connection (Battery start-up)
34008030EN/AD - Page 12
60
(46) Screw driver.
(47) Solution-Pac power management suite CD-ROM.
(48) Network Management card (optional, or standard in
NetPack version).
(49) 4 IEC 10A output cables.
1 - Remove the two fixing screws (59) to
free the battery connector.
2 - Push the battery connector so that you
can read "Connected".
3 - Secure the two fixing screws (59).
59

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pulsar mx4000 rtPulsar mx5000 rt

Tabla de contenido