Operation; Initial Start-Up; Final Start-Up Sequence - Eaton Pulsar Serie Manual De Instalación, Usuario

Ocultar thumbs Ver también para Pulsar Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 149

3.1 Initial start-up

It is essential to contact our Customer Service to ensure that your system is commissionned in complete safety and
to benefit from the manufacturer's guarantee.
UPS personalisation
If UPS personalisation is desired, it is advised to enter the personalisation mode at this time (see the 4.4
"Personalisation" section).

3.2 Final start-up sequence

I
33
34
20
I
30
32
34
29
22
O
21
22
O

3. Operation

1 - Check that the battery switch (60) (see
section 2.2, page 12) on top cover is
connected.
2 - Set the upstream circuit breaker (not
included) to the "I" position (ON).
The equipments are powered via the
Normal AC source, but not protected by
the UPS.
Batteries are recharging, an 8 hour
recharge period is necessary to get full
backup time.
LEDs (22) is ON, LEDs (33) and (34) are
green.
3- Press the "I" button (29) more than 3s.
The buzzer beeps once, and after UPS
internal test sequence, the LED (20) is ON.
LEDs (30), (32), (34) are green.
The equipments are protected by the
UPS.
If LED (21) or (22) is ON, an alarm has
occurred (see the "troubleshooting"
section).
34008030EN/AD - Page 21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pulsar mx4000 rtPulsar mx5000 rt

Tabla de contenido