Commissioning The Bus Coupler - Aventics DDL Serie, CL03 Serie Instrucciones De Servicio

Ocultar thumbs Ver también para DDL Serie, CL03 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 181
80
AVENTICS | DDL, CL03/CL03-XL | R402003658–BDL–001–AE
Commissioning and Operation
W
Bit 3 = 0: If the DDL malfunctions, the output data in the valve
system will be set to 0.
W
Bit 3 = 1: If the DDL malfunctions, the output data in the valve
system will be stored and the solenoids will continue to be
controlled (freeze values).
Changed parameters only become effective when the
device is switched off and then on again or if it is re-
initialized.
7.4

Commissioning the bus coupler

Before commissioning the system, the following steps must
have been carried out and completed:
W
You have assembled the valve system with the bus coupler
(see "Assembling the valve system with the bus coupler" on
page 61).
W
You have connected the bus coupler (see "Connecting the
bus coupler electrically" on page 63).
W
You have made the switch settings and configured the
system (see "Making settings" on page 67).
W
You have configured the bus master so that it actuates the
valves correctly.
Commissioning may only be carried out by qualified
electrical or pneumatic personnel or an instructed person
under the direction and supervision of qualified personnel
(see "Personnel qualifications" on page 55).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cl03-xl serie

Tabla de contenido