Minimum Clearances; Requirements For The Installation Site; Wall-Mounting The Product - Vaillant VPV I Serie Instrucciones De Funcionamiento

Ocultar thumbs Ver también para VPV I Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Installing the inverter
4.4

Minimum clearances

75
B + 124
24
4.5
75
4.6
1.
2.
3.
Condition: The load-bearing capacity of the wall is sufficient
B + 124

Requirements for the installation site

Ensure that the following requirements are satisfied:
The minimum clearances have been maintained
The direct current cable can be laid from the photo-
voltaic modules to the inverter
The alternating current cabling can be laid to the
meter cabinet
The installation site is fixed, vertical and level
The installation site is not exposed to direct sunlight
when installing on an external wall
The immediate installation environment is difficult to
ignite
The installation site is free from continuous vibrations
The installation site meets the requirements of cli-
mate class 4K4H in accordance with IEC 60721-3-4
An Internet router is available for using the web portal
The data connections for connecting other approved
products can be laid to the inverter

Wall-mounting the product

Check the load-bearing capacity of the wall.
Note the total weight of the product.
Only use fixing material that is permitted for the wall.
Use a spirit level to align the mounting plate horizontally
on the wall, as shown in the figure.
Use four screws to secure the mounting plate to the wall.
Installation and maintenance instructions VPV I 0020273427_02