Troubleshooting - Vaillant VPV I Serie Instrucciones De Funcionamiento

Ocultar thumbs Ver también para VPV I Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Event message
Self test failed
ENS Software incompat-
ible
PU Software incompat-
ible
Time/date lost
E.2

Troubleshooting

Before carrying out one of the following measures, check whether the fault can be identified and eliminated using event mes-
sages and troubleshooting.
Fault
Display is dark and does not
display numbers.
No output power
Note
Display view: -- W
0020273427_02 VPV I Installation and maintenance instructions
Symbol
Cause
A fault occurs during the self-test, the self-
test has been stopped.
After a firmware update, the various software
versions in the inverter are no longer com-
patible with each other.
After a firmware update, the various software
versions in the inverter are no longer com-
patible with each other.
The inverter has lost the time because it
was disconnected from the mains for too
long.
Yield data cannot be saved; event mes-
sages only with an incorrect date.
Cause
Alternating current installation not working prop-
erly.
Inverter defective.
Alternating current plug not working properly.
Insufficient power is available for the photovoltaic
generator.
Direct current plug not working properly.
Measure
Validity: Except for Italy
Ignore the message and delete the event
log.
Validity: Italy
Repeat the self-test after approx. 10
minutes or when there is a higher level
of sunlight.
If the self-test has been interrupted
again, check the country setting and
repeat the self-test.
If the self-test has been interrupted
again, check the alternating current
installation (utility connection).
If the self-test has been interrupted
again, call customer service.
If the message occurs more than five times,
contact customer service.
If the message occurs more than five times,
contact customer service.
Correct the date and time settings.
Measure
Check the alternating current installation (utility
connection):
Check the circuit breaker (fuse) and, if re-
quired, switch it on.
Check the residual-current circuit breaker
and, if required, switch it on.
If required, contact customer service.
Replace the inverter.
Check the alternating current plug:
Open the plug.
Ensure that the threaded connections are
mechanically and electrically faultless.
Check whether the following reasons are
present, for example, and eliminate these where
possible:
Snow on the photovoltaic modules
Shadows on the photovoltaic modules
Heavy clouds
Dawn/dusk or night
Check the direct current plug and, if required,
repair it:
Chafing or pressure points on direct current
cables
Alternating current connections
Crimping
Check whether transfer resistances arise due to
corrosion and eliminate these.
Appendix
47

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Vpv i 1500/2Vpv i 2000/2Vpv i 2500/2Vpv i 3000/2Vpv i 4000/2

Tabla de contenido