High Shelf Assembly - Thermador PROFESSIONAL PRO HARMONY PRG304GH Manual De Instalación Y De Usario

Estufas de gas
Ocultar thumbs Ver también para PROFESSIONAL PRO HARMONY PRG304GH:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

High Shelf Assembly

1. Remove protective plastic.
2. Slide the shelf onto the backguard panel.
Figure 17: High Shelf Assembly Rear View
3. Install the included stainless screws along the topside
of shelf and into the back of the shelf.
4. Begin with Backguard Installation.
Backguard Installation
1. Depending on model, remove the (3) or (4) T-20 Torx
stainless screws in the front face of the included Flush
Island Trim.
Figure 18: Flush Island Trim Front Face Screw Removal
English 20
2. Remove the (4) drill point screws securing the trim to
the side panels, and the (2) to (4) drill point screws
securing the piece to the back panel. Lift up to fully
remove.
Figure 19: Flush Island Trim Rear Screw Removal
3. Align the back panel of the new accessory with the
flanges on the range side panels right and left rear
corners. The backguard is inserted inside the guide
channels on the back of the range (Figure 20).
4. Make sure the backguard's front face is outside the
flange on the front side of the range.
5. Re-install screws removed in Steps 1 and 2.
Figure 20: Backguard Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido