5.2.3 Checking the tightness of pressure gas lines

Pressure gas lines are all lines from the gas containers to the
vacuum regulator.
If the plant is equipped with a nitrogen rinsing device:
Check tightness roughly with nitrogen.
Detailed checking with amonia.
Checking the tightness with nitrogen
Close all container valves
Open container connection valves and all shut-off valves up to
the gas dosing system
Open the connection valve of the nitrogen cylinder
Slowly open the valve of the nitrogen cylinder, until the lines
have a pressure of about 10 bar (read at the manometer of
the vacuum regulator).
Warning
Maximum nitrogen pressure 16 bar!
Danger of damages and chlorine break-out when
being exceeded!
Apply soap water to all components under pressure
– Formation of bubbles and/or pressure drop at manometer:
Leakage in pressure lines!
Depressurize the plant!
Eliminate leakage!
Check tightness again!
No formation of bubbles, pressure at manometer does not drop
significantly within one hour: Pressure lines are tight.
Checking the tightness with ammonia
Open all container valves and container connection valves and
quickly close them again
Slowly pass the open ammonia bottle along pressure-gas
leading parts
Formation of white mist: Leakage in pressure lines!
Depressurize the plant!
Eliminate leakage!
Check tightness again!
Fig. 27 Formation of white mist: Leakage in pressure lines!
– No formation of white mist: Pressure lines are tight.
Fig. 28 No formation of white mist
Warning
Liquid ammonia must not come in contact with parts
of the plant!
Danger of leakages by corrosion!
20
Fig. 29 Danger of leakages

5.2.4 Servomotor tests

Warning
The drive may only be commissioned if the hood and
cable entries are properly closed.
Warning
Please note that the process of commissioning the
drive will cause associated fittings/levers/rodding to
move.
Warning
Check that all the emergency equipment/functions on
your installation are working correctly.
Warning
Once all adjustment work has been completed,
check that the drive and the fittings/levers, etc.
operated by it are working correctly.
Warning
Never work with a damaged drive.
When commissioning, all the installation's
Caution
components must be ready for operation.
Follow the installation and operating instructions for
Note
the components used.
5.2.5 Checking the servomotor's direction of rotation
The servomotor is controlled by an external controller. This
means that the servomotor's direction of rotation depends on the
controller's cabling and settings being correct.
Observe the installation and operating instructions
Note
for the controller and the gas dosing system.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vaccuperm vgs-143Vaccuperm vgs-145

Tabla de contenido