Commissioning The Instrument - MSA ALTAIR Manual De Operación

Ocultar thumbs Ver también para ALTAIR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 99
OPERATION
3.2.

Commissioning the instrument

Before the instrument can be used for monitoring possible toxic gases in
the atmosphere, it must be commissioned.
(1) Press and hold [TEST] key for 3 s, until "
(2) Release [TEST] key and press again.
After about 1 s, all display indicators are activated;
Acoustic alarm sounds, alarm LEDs light up and vibration alarm is
triggered;
The software version is displayed for approx. 3 s;
The gas type is displayed for approx. 3 s more (O
LO
approx. 3 s.
During the display of
corresponding setpoints can still be changed ( Section 3.1).
(3) Release [TEST] key and wait for 3 s.
Instrument begins an activation cycle of 99 s duration (countdown).
After activation, the remaining operation time is displayed in months.
The ready indicator lights up every 60 s and the alarm LEDs light up
briefly.
After successful activation, the instrument remains active without
interruption until the battery is flat.
14
ALARM
and
as well as
LO
ALTAIR Operating Manual
ON
" and "
HI
ALARM
and
ALARM
and
as well as
?
" are displayed.
, H
S or CO).
2
2
are displayed alternately for
HI
ALARM
and
MSA
, the
GB