Wiring Installation; Preparation - Tripp-Lite SUDC208V42P Serie Manual Del Propietário

Centro de distribución de energía
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Wiring Installation

6.1 Preparation

Warning: All wiring must be performed by a qualified, certified electrician.
• Review the entire manual before wiring the Distribution Center, including all warnings.
• Consider how you will route power into the unit, wire all internal connections and route power out of the unit, making careful
measurements.
• Input wiring measurements will differ for concrete floor and raised floor installations. See Section 6.5 for more information.
• The cabling to wire the 3-phase power source to the Distribution Center is not included with the Distribution Center. Make sure the
electrician supplies the appropriate cabling, in accordance with NEC and all other applicable local or national electrical regulations.
• Routing output cord sets from the top of the Distribution Center to your racks and PDUs should be managed systematically,
with proper data and power cable segregation. Tripp Lite offers a full line of external cable management accessories (sold
separately), including SRCABLELADDER, SRCABLETRAY and SRCABLETRAYEXP .
Ordering Required Breakers and Cord Sets
• Decide how many and what type of output breakers and cord sets you need (see below).
• Contact your distributor or go to tripplite.com to order.
Warning: Use Tripp Lite breakers and cord sets only.
Note: When ordering cord sets, order longer cords than the minimum required. The electrician can trim the ROJ section for a custom fit.
Available Output Branch Circuit Breakers
Tripp Lite #
SUBB120
SUBB230
SUBB320
SUBB330
Description
Single-Pole, 20A Breaker
2-Pole, 30A Breaker
3-Pole, 20A Breaker
3-Pole, 30A Breaker
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sudc208v42p30mSudc208v42p40mSudc208v42p60mSudc208v84p60m

Tabla de contenido