Jacuzzi START! 70 Manual De Instalación, Uso Y Mantenimiento página 15

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

i
I
(
27 det.1) Apply silicone to along the entire length of
the outer profile of the glass panels and of the tray. Make sure
that the surfaces are clean.
NOTE: if the shower box has been installed with the wall
finished, also apply silicone to the gaps between the show-
er tray and the wall.
(det.2) Press in the closing covers over the compensators and
glass panels.
(det.3) After 24 hours, remove the plastic blocks that hold the
glass panels in place.
If requested, place the optional footboard on the tray.
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Start! 80Start! 90Start! 90 round

Tabla de contenido