Initial Setup and Start
Illustration 3.4 LCS Tool - Initial Screen
3.
Verify that date and time are correct. If not, set
date and time and continue. See Illustration 3.5.
Illustration 3.5 LCS Tool - Verify Date and Time
4.
A list of inverters identified by the selected
Inverter Manager is shown. See Illustration 3.6.
Verify that the list of inverters is complete.
Verify that all inverters are present. It is possible
to continue the configuration of the listed
L00410644-01_2q / Rev. date: 2014-06-02
inverters even if not all inverters are discovered.
The undiscovered inverters can always be
configured later.
3
3
23