SMA MLX Serie Guia De Instalacion página 25

Ocultar thumbs Ver también para MLX Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Initial Setup and Start
3
3
Illustration 3.6 LCS Tool - List of Connected Inverters
5.
Select the desired country from the list of options
available for the inverters in the network. See
Illustration 3.7.
6.
Select the desired grid code from the list of
options available for the selected country. If
Illustration 3.7 LCS Tool - Select Country and Grid Code
7.
The LCS Tool prompts for a confirmation of the
selected country and grid code. See
24
needed, load a custom grid code by clicking the
'Load' button. See Illustration 3.7. The 'Create'
button is inactive and cannot be used.
Illustration 3.8. Incorrect configuration can be
changed using the 'Back' button and changing
the settings in the previous windows.
L00410644-01_2q / Rev. date: 2014-06-02

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Mlx 60 ul

Tabla de contenido