Parts Identification; Operating Your Dehumidifier; Set Unit Upright; Set Up Drain Hose - Dri-Eaz LGR 7000XLi El Manual Del Propietario

Ocultar thumbs Ver también para LGR 7000XLi:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PARTS IDENTIFICATION

FIG. A: FRONT
FIG. C: POWER
ATTACHMENT POINT

OPERATING YOUR DEHUMIDIFIER

Set unit upright

NOTICE: If you transport or store the 7000XLi
dehumidifier in a horizontal position, set it upright and let
it stand for at least 30 minutes before you turn it on.
When the machine is placed in a horizontal position, the
oil from the compressor can flow into the refrigerant coils
and reduce the ability of the dehumidifier to function.

Set up drain hose

The 7000XLi condensate pump connects to a plastic
drainage hose that is located in the pocket on the back
07-01776B Warranty 07-00420
Humid air inlet.
3M™ HAF filter.
Molded pocket
for cord storage.
Control panel.
Process (dehumidified)
air outlet. May be used
with standard 12 in.
rigid or layflat ducting.
Power cord socket.
2
FIG. B: REAR
Integrated handle.
Lower back panel. Remove
to access the pump.
of the unit. This hose is equipped with a quick-connect
fitting for quick attachment to the provided 40 ft. (12 m)
drain hose. Unwrap the entire hose and place the
unattached end in a sink, drain, bucket or outside –
anywhere that water can drain out safely. If you use a
bucket or other receptacle for water collection, check it
regularly to prevent spills.
NOTICE: Uncoil and straighten the entire drain hose. Do
not leave any of part of the hose coiled on the unit and
do not place the end of the hose higher than 20 ft. (6 m)
above the bottom of the unit. Also check for kinks or
other obstructions that might restrict the flow of water.
Obstructions may cause a water backup and result in
leakage.
Drain hose pocket.
Drain hose location.
Dri-Eaz Products, Inc.

Publicidad

Tabla de contenido
loading

Tabla de contenido