EdilKamin MIMI’ Instalación Uso Y Mantenimiento página 30

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
MOUNTING THE COVERING
NORMA
Step A
se A
Step C
e C
Step B
1
3
2
Step D
D
30
Step A
This step shows the stove after having been unpacked
and positioned in the room.
Step B
Remove the lower front panel, using a normal screwdri-
ver as a lever on the upper part, whilst ensuring not to
damage the manual channelling control (if applicable).
Step C
Fasten the lower front panel to its support found bene-
ath the door, using the screws and washers D.6 sup-
plied.
Use M6 screws and washers to install the upper stone
profile and the cast iron front panel. Unless already in
place, position 4 rubbers in the 4 upper front panel sup-
port holes. Then open the door and fasten the front
panels to the lower part of the structure by applying the
screws supplied.
Step D
Unless already inserted, place 5 rubbers into the sheet
metal central top and place the stone top on these.
The picture shows all parts necessary to mount the
stone covering, considering that the sides (89) and spa-
cers (90) are already mounted.
32
63
103
90
89
90
104
89
24
90
22
63
90
19
15

Publicidad

Tabla de contenido
loading

Tabla de contenido