Revision
(A) Page 12, 'Min Eval' option was removed from Max Service Requirements if LI
deployed.
(B) Page 12, 'Max Service' was revised to include mandatory pawl spring replace-
ment.
5
(C) Page 15, Note was revised to include pawl spring replacement for units that do
not pass SRL drop test.
(8-10-2016)
(D) Page 18, Additional cable assembly inspection criteria for kinking was added to
BTS
ensure that cables are replaced when appropriate.
(A) Page 4-7, Workman SRL Parts Lists were revised.
(B) Page 8, the exploded view of the Upper Frame Subassembly was revised to
remove the oil application.
6
(C) Page 9, a note was added.
(D) Page 16, an arrow was added.
(9-16-2016)
(E) Page 21, Internal Subassembly section was revised to include plastic and metal
nozzles.
Workman® 30' & 50'
Revision
US
23